Providing welding supervision and inspection for entire welding activities on Sydney Water pipeline.
Welding process: Manual Metal Arc Welding (MMA) using Cellulosic electrodes
Scope
• DN 900(1,979 meters) Liverpool Reservoir to Cecil Park via Cecil Hills
Providing welding supervision and inspection for entire welding activities on Sydney Water pipeline.
Welding process: Manual Metal Arc Welding (MMA) using Cellulosic electrodes
Scope
• DN1200 (2,018 metres) Cecil Park to Oran Park,
• DN 900 (1,303 metres) Cecil Park to Liverpool, and
• DN 450 (286 metres) Cecil Park Reservoir.
Tasks:
• Developing Welding procedure specification to meet the requirements of the project specification
• Qualifying welders to AS NZS 1554.1:2014
• Providing welding supervision and welding inspection as per the requirements of AS/NZS 1554.1 and the project specification
St. Marys WRP Installation & Backfilling – Diona – Sydney Water
Implementing the tasks of welding supervisor welding inspectors for welding on reinforcement steels manufactured to AS/NZS 4671
Welding Process: Gas Metal Arc Welding (GMAW)
• Developing welding procedure specification as per the project specification and in accordance to the relevant standard
• Monitoring the and welding supervision
• Providing final welding inspection services in accordance with AS/NZS 1554.3:2014
• Witness NDT testing
• Welding inspection reports,ITP and other documentations
Implementing the tasks of welding supervisor welding inspectors for welding on reinforcement steels manufactured to AS/NZS 4671
Welding procedures specs, welder qualification to AS/NZS 1554 part 3: 2014
MMA Civil - Welding procedures specs, welder qualification to AS/NZS 3992
Third party QA/QC Fire station pipe system
• Review welding procedure specifications and welder qualifications
• Review parent material certificate and Hydrostatic procedure
• Review Pressure gauge calibration certificate
• Review NDT technicians qualifications
• Witness Hydro test on pipe columns and head charge.
• Check heat numbers,Pipe Ids ,etc
• Review ITP and sign the applicable section
Final welding inspection and third party QA/QC service on fabricated boos fan and components to AS/NZS 1554 Parts 1,4 &5. AS 3992
• Review WPSs and WQRs
• Review manufacturing drawing against fabricated items
• Review Welding supervisors and NDT technician qualifications
• Welding inspection on welded items such as impeller, EVASE Section 1,2& 3,Base Frame, Bearing pedestal, Non drive end inlet cone, Drive end inlet cone
• Prepare and submit final reports
Delivering welding supervision and inspection on Natural Gas Pipeline.
Maintenance and reparing corrosions and stress cracks along the pipeline utilizing Petro Sleeves repair application.